Backyard – Drainage Progress – Part 2

Yesterday since I had to look after the kids for the day, I decided to do more work in the backyard with the drainage. The aim was to setup the drains and back fill with blue metal. As you can see below it came up very good.

backyard_drainage_02-may-2014_pic01

backyard_drainage_02-may-2014_pic02

Next step is to now back fill with some soil so that we can cover over the area with some other material, as we will be moving the kids big trampoline back to this spot as it won’t be a grassed area any more.

I put the hose in the last drain and left it running for a bit and like my previous test the water will hit the junction and go into the storm water line that goes to the street. So the water naturally finds the path along the trench in which I now have the arg line laid and covered it with blue metal.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>